Projects

PROJECT

Qatar Shell Services W.L.L. Ras laffan, Qatar

Roof waterproofing application

PROJECT

Sinohydro, Incop – Kahramaa Awareness Park

Intumescent Fireproofing Coatings

  • Applied advanced fireproofing solutions to enhance structural safety and meet fire protection standards.

Night Shift Operations

  • Work was executed during the night shift to optimize efficiency and minimize disruptions.

Racking System for Quality & Efficiency

  • Designed and implemented a custom racking system to streamline the fireproofing process, ensuring higher quality and reduced processing time.

Pre-Painting Assembled Structures Before Lifting 

    • Structures were coated before installation, ensuring a uniform finish while reducing on-site coating challenges and improving overall efficiency.
PROJECT

Al Balagh – Barzan Camp Phase-2, Supreme Command Building

Intumescent Fireproofing Coatings

  • Applied specialized intumescent fireproof coatings to enhance the fire resistance of structural elements.
  • Ensured compliance with fire safety regulations and military-grade protection standards.
PROJECT

Woqod Warehouse & Workshop – New Industrial Area

Epoxy & Polyurethane Flooring Solutions

    • Installed high-performance epoxy and polyurethane coatings to enhance durability, chemical resistance, and load-bearing capacity.
    • Designed to withstand heavy-duty industrial operations, ensuring a long-lasting, low-maintenance flooring solution.
PROJECT

QNCC (Qatar National Convention Centre)

Passive Fire Protection Solutions

  • Applied intumescent and cementitious fireproof coatings to enhance fire resistance for structural safety.
  • Ensured compliance with Qatar’s fire safety regulations and international standards.
Cementitious fireproofing coatings

NDIA (New Doha International Airport)

CP 26 hangar building ASRS & LV 3 areas–

NDIA CP11, cladding repairs, high finishing spray paint repairs/touch ups